Land Pipeline and Interconnecting Works Nigerian Power Plant 450 MWe Project

Scope of work:

The Scope consist s of the execution of:

  1. 18" 14 km Fuel Gas Pipeline
  2. 4" Closed Drain Pipeline
  3. 4" Process Water Pipeline
  4. Fiber Optic Cable
  5. 1 No. 16" Water Pipeline
  6. Interconnecting Works including all necessary process facilities and auxiliaries
  7. Cathodic protection
  8. Between NAOC-KGP Gas Condensate Treatment Plant (KPG) and new Nigeria 450 Mwe Power Plant.