Construction of Owodopokpor-Oviri-Olomu Avoba-Erhuwarew road with 3nos bridge
Scope of work:
- Construction of 10km long asphalt road,7.30mt width with 2.75mt surface dresses shoulder
- Two 20mts long bridges on piles and 1no long bridge over a major river on piles