Traverser Installation Success
Traverser Installation Success
On 21st of November, Alcon succesfully installed the traverser beam. The installation of the 96 Tons and 50 meters traverser was a a major milestone on the road to successful project completion.
See below a gallery of photos from the installation.
Installation of Free Issue Monorail Track work and Associated Items
SCOPE OF WORK:
The complete scope of work on the Rivers Monorail Project with regards to the assembly and installation works includes the guideway (also called track beams), depot, stations and electrical power rooms.
The guideway installation on the Rivers Monorail Project consists of approximately 6.5km double track which are divided up into two phases namely phase 1A and Phase 1B. Phase 1A consists of 2.6km single track from the depot (just south of Lagos bus stop) up to UTC Junction station. Phase 1B consists of 2.6km additional single track between the Depot and UTC Junction station and 3.9km double track from UTC Junction station up to Waterlines Station.
Completion and Commissioning of FYIP-CPF/CCP Plant & North Bank Flow Station.
Addendum to Section IV (B) Scope of Work (FYIP New Onshore Scope - Phase II)
SCOPE OF WORK:

EPIC Development of Outstation Accomodation at NUN River
- Details
- Category: Nun River Project
EPIC Development Outstation Permanent Accommodation at Nun River
SCOPE OF WORK:
Building Construction; Equipment Supply & Installation; Infrastructural / External Works Construction of Remote Secure and Complete recommendation facilities for SPDC
Akwa Ibom State International Airport - AKIA (Phase II)
SCOPE OF WORK:
Construction of main terminal building, APRON, road network, parking and walkways.
- ACCOMODATE AND OPERATE 5 STANDARD JET WAYS
- 3 COMPLETE TERMINAL FINGER SYSTEMS
- 1 TERMINAL DOOR TO BE EQUIPPED FOR VIP PLANES
- 1 OPTIONAL COMPLETE TERMINAL SYSTEM FOR AIRBUS 380
- ACCESS ROAD NETWORK (approximately 32.000 sqm.)
- CAR PARK SYSTEM (approximately 10.000 sqm.)
- MAXIMUM AIR PASSENGER TRAFFIC: 1.50 Million passengers per year
- TYPICAL PEAK HOUR PASSENGERS: 750 passengers
- NOT INCLUDING RUNWAY CONNECTION TAXIWAYS
- AIR-SIDE FIXED FITTINGS AND EQUIPMENT.
More Articles...
Subcategories
- Under Execution
-
Finalized
- Akia 1A
- FLB Gbaran Project
- Okoloma Gas
- EPIC for Idu Gas Field I
- Cawhorne Channel
- Forcados Yokri I
- Afam Gas Receiving
- Nigerian Power Plan 450
- Bonny Gas Expansion
- NLNG Back Up Gas
- Owodopkpor
- Unicem Calabar
- Forcados Yokri
- UQUO Gas Plant
- NLNG Bonny Island
- EPIC for Idu Gas Field
- Afam F5 (Okoloma)
- Soku
- Gbaran SOS
- Fabrication