Welcome to Alcon!

  • About us

    Who is Alcon?

    EPC Contractor in the Upstream, Midstream, Downstream, Power Systems and Infrastructure for projects with individual value of up to 250 MUSD. P&C Contractor for projects up to 400M USD.

     

     

    Alcon's Read More

  • Alcon News

    Alcon's most recent news! Read More
  • Under Execution Projects

    Alcon's current projects:
    Akia Phase II
    PH Monorail
    Nun River Project
    Soku Project
    Okoloma Project
    Bonny RA Project
    Forcado Yokri Project
    Read More
  • Finalized Projects

    A brief presentation of major Alcon's executed projects. Read More
  • CSR

    CORPORATE SOCIAL RESPONSIBILITY (CSR) POLICY

    ALCON  believe the principles of corporate social responsibility (CSR) and good corporate citizenship are key to our success. Our CSR stance focuses on four key areas : Client and marketplace

    Read More
  • 1
  • 2
  • 3
  • 4
  • 5

Installation of Free Issue Monorail Track work and Associated Items

 

SCOPE OF WORK:

The complete scope of work on the Rivers Monorail Project with regards to the assembly and installation works includes the guideway (also called track beams), depot, stations and electrical power rooms.

The guideway installation on the Rivers Monorail Project consists of approximately 6.5km double track which are divided up into two phases namely phase 1A and Phase 1B. Phase 1A consists of 2.6km single track from the depot (just south of Lagos bus stop) up to UTC Junction station. Phase 1B consists of 2.6km additional single track between the Depot and UTC Junction station and 3.9km double track from UTC Junction station up to Waterlines Station.

 The scope of work requirements pertaining to the Electrical and Mechanical works for the assembly and installation of the guideway system on Phase 1A of the Rivers Monorail Project. The high-level activity consists of:

  • Site preparation & Installation preparation
    • Zero datum point establishment
    • Site preparation (pre-assembly area and site)
    • Install preparation (pre-assembly area and site)
  • As-build survey (check)
  • Install assembly and installation jigs in pre-assembly area/
  • Assemble crossbeams and tracks in the pre-assembly area.
  • Load, Transport, Off-Load and Install Track beam elements (mechanical)
  • Install all other relevant mechanical equipment (walkways etc.)
  • Install all relevant electrical equipment on the guideway system
  • As built and documentation

 

CLIENT

RIVERS MONORAIL COMPANY/ MINISTRY OF TRANSPORT

Site

PORT HARCOURT, RIVERS STATE

Project Description

Installation of Free Issue Monorail Track work and Associated Items

Scope of Work

Assembly and Installation of Tracks of the Rivers Monorail ( Phase 1A) 2.60kms –Civil, Electrical, Mechanical and Instrumentation Works)

Actual Progress

89.3%

 

Total Amount (USD)

 $9,350,000.00

 

MONORAIL PROJECT - PHOTO GALLERY

MONORAIL
MONORAIL
MONORAIL
MONORAIL
MONORAIL
MONORAIL
MONORAIL
MONORAIL
MONORAIL
MONORAIL
MONORAIL
MONORAIL

You are here: Home Under Execution Rivers Monorail Project Installation of Free Issue Monorail Track work and Associated Items