Welcome to Alcon!

  • About us

    Who is Alcon?

    EPC Contractor in the Upstream, Midstream, Downstream, Power Systems and Infrastructure for projects with individual value of up to 250 MUSD. P&C Contractor for projects up to 400M USD.

     

     

    Alcon's Read More

  • Alcon News

    Alcon's most recent news! Read More
  • Under Execution Projects

    Alcon's current projects:
    Akia Phase II
    PH Monorail
    Nun River Project
    Soku Project
    Okoloma Project
    Bonny RA Project
    Forcado Yokri Project
    Read More
  • Finalized Projects

    A brief presentation of major Alcon's executed projects. Read More
  • CSR

    CORPORATE SOCIAL RESPONSIBILITY (CSR) POLICY

    ALCON  believe the principles of corporate social responsibility (CSR) and good corporate citizenship are key to our success. Our CSR stance focuses on four key areas : Client and marketplace

    Read More
  • 1
  • 2
  • 3
  • 4
  • 5

EPCC of RA Type 3 Apartment- Phase 1

EPCC of RA Type 3 Apartment- Phase 1

SCOPE OF WORK:

The scope of work for the EPC of RA Type 3 Apartment- Phase 1 Project are as follows:

• Construction of 12 units of 3 floor apartment blocks, which consists of six – 3 bedroom building , two each floor;

• Associated infrastructure including underground services (power, telecom, potable water, waste water, fire water and fire alarm);

• Roads and car parks;

• Storm drainages;

• Street lightings;

• Landscaping;

• New water tank;

• Power substation and

• Centralized air conditioning chiller plant.

CLIENT

Nigeria LNG 

Site

Bonny Island

Project Description

EPCC of RA Type 3 Apartment- Phase 1

Scope of Work

Construction of Residential Area

Actual Progress

3.5%


 

Total Amount (USD)

 $109,326,000

NLNG MD HSE WALK ABOUT REPORT

DATE: 29th August, 2014 Auditors: Babs Omotowa (MD) Ugo Igboelina (Project Lead) Felix Onyebuchie (PPS/73C) Kulakowski, Aleksander (PPI/61C) Hart, Joseph (PPS/71C) Contractor: Grosso Flavio (PM) G. Ferrero (CM) Prince Igwe(HSE Manager) Ezekiel Ogbu(HSE Coord) Opiti, Onyebuchi (Logistics Coord)

AREA VISITED: ALCON RA Site DISTRIBUTION:

C O D E *

Action Parties

Action Completion Date

Observation: Positive

       

Specific area:

Description of observation

Action

 

Who

When

Worksite

Very well organised. Clean/housekeeping well done. Workers attitude was perfect.

Keep it up

     

Observation: Negative / improvements

       

Permit to work

He observed that a permit that had no relevance with an ongoing work activity was in the PTW box.

He advised that such permit should not be kept on site, because it may confuse the workers.

A

Prince Igwe (HSE manager)

29/08/14

Code A requires immediate action; Code B requires action in 24 hrs; Code C requires action in 7 days; Code D requires action > 7 days

* Omnisafe inspection reporting: All actions that cannot be closed within 7 days are to be tracked in Omnisafe.
 

Pictorial View

MD being lead into the site by UGO-Project Lead and other Project team. ALCON PM welcoming the MD to RA site

BONNY RA PROJECT - PHOTO GALLERY

block 11 - blin...
block 11 - blinding concrete on waterproof sheet membrane-600
excavation and ...
excavation and compaction block 10-600
formworks insta...
formworks installation for the ground beams block 11-600
overview of blo...
overview of blocks 12 11 10 and 09 with fully set  up dewatering systems-600
rebars assemble...
rebars assembled for installations-600
surveyors takin...
surveyors taking levels-600

You are here: Home Under Execution RA Bonny